Project Resume
- ClientSENDAN / JGC / ARAMCO Zuluf
- Project LocationZuluf
- Scope of WorkElectrical & Instrumentation Works
- Project DurationApril 2023 – March 2026
- Man Hours3 Million
- Contract ValueSAR 85 Million
- Peak Manpower1400
- Major EquipmentCrane 100T/8T/50T, Forklift 10/15T, Manlifts, Generators 900/400/600/125 KVA, Backhoe Loader, Trailers (Low/Flat Bed), Electrical & Instrumentation Testing Equipment
Detailed Scope of Work
- 230KV GIS Installation – 1 No
- 13.8KV Substation Installation, Testing & Commissioning – 3 Nos
- Shunt Reactors 100 MVA Installation – 2 Nos
- 80 MVA Power Transformer Installation – 8 Nos
- Installation of All Other Control and Relay Panels
- Grounding Works
- Cathodic Protection System Installation
- Cable Tray and Support Installation
- HV / MV LC and Control Cable Pulling for 2700 KMs
- Outdoor Lighting System (Poles, Transformers, JBs, Fixtures) Plant-wide
- All Field Instrumentation Installation and Calibration
- Instrument Cable Laying, Termination and Loop Test