Cathodic Protection System for 15 Tank Bottoms
DOUGLAS / TR — Riyas NGL Project
-
Home
- Projects
- Cathodic Protection System for 15 Tank Bottoms
Project Resume
- ClientDOUGLAS / TR
- Project LocationRiyas NGL Project
- Scope of WorkCathodic Protection System for 15 Tank Bottoms
- Project DurationMay 2025 – December 2025
- Man Hours—
- Contract ValueSAR 634,534.00
- Peak Manpower10
- Major EquipmentHoliday Tester, Spot Welding Machine, Reference Electrode CUSO4, Multimeter
Detailed Scope of Work
- Installation and Spot Welding of MMO Anodes, Conductor Bar
- Installation of Reference Electrode, ER Probe, Perforated Monitoring Pipe
- Holiday Test of Anode Feeder Cables
- Installation and Spot Welding for Anode Feeder Cables